DSpace
 

Digital Library @ University of Peradeniya >
Annual Research Sessions >
PURSE 2007 >

Please use this identifier to cite or link to this item: http://dlib.pdn.ac.lk/handle/123456789/3149

Title: Limitation of connecting mini hydropower plants to the Sri Lankan power system network: a case study at Balangoda grid substation
Authors: Weerasekera, A. I.
Arulampalam, A.
Ekanayake, J. B.
Keywords: Engineering
Mini Hydro Power Plants
Grid Substation
Issue Date: 2007
Publisher: The University of Peradeniya , Peradeniya , Sri Lanka
Citation: Proceedings and Abstracts of the Annual Research Sessions , November 30 , 2007 , University of Peradeniya , Sri Lanka pp.263-265
URI: http://hdl.handle.net/123456789/3149
Appears in Collections:PURSE 2007

Files in This Item:

File Description SizeFormat
A.I. Weerasekara 2007.pdf1.68 MBAdobe PDFView/Open

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

 

Valid XHTML 1.0! DSpace Software Copyright © 2002-2010  Duraspace - Feedback